Photo Links
Links to project photos of various items
 
Helium Flex Line Installation
May 12, 2008 Photos of LBT
LBTI Assembly (Flex Rig) May - June 2008
Shipping to Mt Graham & High Bay Testing (July 7-8, 2008)
Assembly of the instrument in the LBT High Bay  (July 17, 2008)
Preparation of the platform (July 17, 2008)
Lifting the LBTI onto the telescope (July 18, 2008)
Aligning and Match Drilling the mounting feet (July 18-19, 2008)
NASA HQ & JPL tour of LBTO and LBTI (Aug 8, 2008)